| 1 | Development of Western Dock on BOT basis to handle Cape size vessels. | 2392.13 | Under implementation |
| 2 | Construction of South Breakwater Extension, Groynes and Breakwater Toe Protection Wall at Paradip Port. | 508.52 | Under implementation |
| 3 | Construction of 2nd exit road cum flyover at Paradip as part of additional Port connectivity from National Highway. | 93 | Under implementation |
| 4 | A Road cum Flyover crossing the BOT Rail Tracks to have unobstructed access to the MCHP areas. | 35.23 | Under implementation |
| 5 | Upgradation and modernization of Fishing Harbour at Paradip in Odisha. | 108.91 | Under implementation |
| 6 | Construction of New Signal Station at Paradip. | 9.16 | Under implementation |
| 7 | Construction of Retaining walls in the Stack yard (MCHP area). | 9.86 | Under implementation |
| 8 | Construction and widening of Concrete Road, Retaining Walls etc. in harbour area. | 43.54 | Under implementation |
| 9 | Development of Storage Plot near JSW Wagon Tippler inside Harbour area. | 9.11 | Under implementation |
| 10 | Development of Plot near BOT Railway bulb and Gate No. 1 approach inside Harbour area. | 9.24 | Under implementation |
| 11 | Mechanized Dust Suppression system for roads inside port prohibited area from Gate No.1 to Gate No.2. | 9.03 | Work Order issued on 04/10/2024 |
| 12 | MCHP-IOHP Connectivity (PMC Consultant M/s MECON) | 66.46 Crores inclusive of all taxes, duties & GST | 1st phase put into operation on dtd. 22/08/2020, 2nd phase project will be taken up on requirement. |
| 13 | Supply, Installation , testing & commissioning of SCADA of Sub-stations of PPA. | 7.62 | Pre-commissioning work is going on. Out of 09 sub-stations, commissioning of 05 sub-stations have been established with MRSS. Commissioning of remaining 04 substations is under process. |
| 14 | Design, fabrication, supply, erection and commissioning of Stacker - cum- Reclaimer of capacity 3000TPH. | 28.12 | Work completed on 18/06/2024 |
| 15 | Design, Engineering, Supply, Installation, Testing & Commissioning of shore to ship power supply facility at Coal Berth-I and Coal Berth-II at Paradip Port Authority on Turnkey basis. | 12.83 | Work Order issued on 12/07/2024 in favour of M/s Romas Electric Private Ltd. Bengaluru in JV with M/s. Danfoss Industries Pvt. Ltd. The firm has submitted the drawings and same has already been approved. |
| 16 | Providing LT Power Supply to CB-I & CB-II. | 2.42 | Completion time of the work has been extended upto 18/11/2024. The approval of documents pertaining to HT & LT Cables submitted by the firm after change in make of cables, is under process. |
| 17 | Supply, Laying Testing & Commissioning of HT / LT Cables at different locations of Paradip Port. | 2.71 | Cables already dispatched and yet reach at paradip Port. |
| 18 | Supply, Installation, Testing & Commissioning of INDOOR type 11KV VCB ICOG standalone panels. | 1.03 | Installation of earthing has already been started. Drawing of panels approved. |
| 19 | RFID Tender (5 years). | 10.40 | New tender to be floated , including AI/ML implementation after the scope of AI/ML is finalised. |
| 20 | Hiring of 02 nos. of Truck mounted Mist cannons for a period of 05 years. | 3.91 | Work started w.e.f. 02/08/2024 |
| 21 | Hiring of 01 no. of Truck mounted Conveyorized Mechanical Road Sweeping Machine for a period of(03+02) years. | 6.61 | Work started w.e.f 24/06/2024 |
| 22 | Supply, Installation and Commissioning along with one year operation and maintenance of RFID based access control system Paradip Port Authority. | 1.72 | O & M Work completed and extended for a period of 03 months w.e.f. 17/09/2024 |